Carports:
1. Pier holes (before the concrete is poured)
2. Final
1. Footing or pier holes (before the concrete is poured)
2. Rough-in (only if you plan to cover the framing)
3. Final

Garages & Room Additions:
1. Footing (before the concrete is poured)
2. Rough-in (when the framing & all trades are in but no insulation)
3. Electrical trench when applicable (wires in the conduit, in the trench, no backfill)
4. Final

Swimming Pools:
2. Bonding inspection
3. Electrical trench (wires in the conduit, in the trench, no backfill)
4. Final

Re-Roofing:
1. Pre-inspection (necessary when new roofing material will be covering existing roofing material
2. Roofing inspection (In-process, after 1/10 of roofing material is installed but no later than 1/4 of job is completed)
3. Final

New Houses:
1. Footing
2. Ground rough plumbing
3. Water, sewer & gas
4. Rough-in (when framing & all trades are in but no insulation)
5. Roofing inspection (In-process, after 1/10 of roofing material is installed but no later than 1/4 of job is completed)
6. Egress & fireplace (have ready with rough-in)
7. Fire Wall (for multi family dwellings only)
8. Lawn sprinkler (backflow when applicable)
9. Electrical service
10. Deck piers when applicable
11. Sidewalk & driveway (formed up with no concrete put in)
12. Final

New Commercial:
1. Footing & Foundation
2. Ground rough plumbing
3. Water, sewer & Gas
4. Rough-in (when framing & all trades are in but no insulation)
5. Roofing inspection (In-process, after 1/10 of roofing material is installed but no later than 1/4 of job is completed)
6. Above ceiling
7. Egress & fireplace when applicable (have ready with rough-in insp.)
8. Fire wall
9. Fire sprinklers
10. Electrical service
11. Lawn sprinkler backflow when applicable
12. Final

Commercial Remodels:
1. Rough-in (when framing & all trades are in but no insulation)
2. Above ceiling electrical
3. Fire Sprinklers
3. Final