Do I need a permit to add or replace solar panels?
Yes, a building permit is needed to add or replace an existing solar panels systems.
Exception: Maintenance of an existing system.
What do I need to submit in order to receive a permit?
Completed Solar Photovoltaic Systems Permit Application & Checklist.
What Inspections are needed?
Final inspection. Final inspection shall be made after the permitted work is completed and prior to use.
What International Building Codes have been adopted by the City?
The City of Gladstone is currently operating under the ICC 2021 Construction Code Series and the 2020 National Electric Code. These code books are kept on file in Community Development for viewing.
How much is a building permit?
The fee for a building permit is based on the value (or cost) of the proposed structure you are building.
For Permit Fee Schedule click here.
Solar Photovoltaic Systems Permit Construction Guidelines
Gladstone's Alternate Energy Ordinance
If you have further questions feel free to call our office at (816) 423-4111 or click here.